Project Overview

A Complete Air-Quality Overhaul for Heavy Fabrication

Sharp Iron Group's Reilly Road Building required a complete solution for welding fume extraction. The facility was operating without any dedicated fume removal system while supporting heavy welding activity. With a newly installed air conditioning system, controlling and evacuating welding fumes became a priority to maintain safe and comfortable working conditions.

32
Pallets audited during install
MDB-8
System model installed
100%
Customer satisfaction confirmed
Challenge & Solution

From Zero Infrastructure
to Full Fume Control

The Challenge

No Existing Capture System

The facility was operating without any existing welding fume capture or filtration system, despite continuous heavy welding work. This created poor air quality conditions and increased the need for proper ventilation and contaminant control — all while integrating with a brand-new building setup.

Our Solution

MDB-8 with Diluter Pro

An MDB-8 with Diluter Pro system was installed to capture and manage welding fumes generated within the facility. The solution was selected to improve overall air quality and support a cleaner working environment for ongoing fabrication activities.

Installation Photography

The System in Place

Installation Process

How the Project Unfolded

Feb 2
2026

Installation Completed

The full system installation was completed on site, including coordinating setup, wiring, and commissioning to ensure proper integration and operation within the facility.

During
Install

Component Audit — 32 Pallets

A full shipment review identified missing components across 32 pallets. A comprehensive inventory check with supporting photos was conducted to document every discrepancy.

Resolution

Escalation & Replacement Parts

The issue was escalated to our operations manager. Replacement parts were arranged and shipped promptly, ensuring the project was completed without further delays.

Apr 15
2026

Follow-Up Site Visit

A site visit confirmed the customer is fully satisfied with system performance and the overall installation outcome. The system is operating as intended.

Challenges & Resolution

Handling the Unexpected

During installation, missing components were identified across a shipment of 32 pallets. Rather than accepting delays, we followed a structured resolution process to keep the project on track.

Full Inventory Audit

Every pallet — all 32 — was inspected and photographically documented to identify exactly which components were missing.

Operations Escalation

The issue was immediately escalated to our operations manager, who took ownership and coordinated a fast resolution.

Parts Shipped & Delivered

Replacement components were arranged and dispatched without delay, completing the installation on schedule.

"
The customer confirmed they are satisfied with the system performance and overall installation outcome.

— Site Visit Follow-Up  ·  April 15, 2026  ·  Sharp Iron Group

Outcome

Ready for Full
Operational Use

The installation was successfully completed and prepared for operational use. At the time of completion, the facility was operating with large open doors due to favorable weather conditions, which limited full system utilization.

The system is expected to operate at full efficiency once the HVAC system is fully in use and the facility remains closed during welding operations.

A follow-up visit on April 15, 2026 confirmed the customer is satisfied with the installation and overall outcome. The MDB-8 with Diluter Pro is fully commissioned and ready to deliver clean-air performance at scale.

Project Summary
ClientSharp Iron Group
SiteReilly Road, Wichita Falls TX
SystemMDB-8 + Diluter Pro
InstalledFeb 2, 2026
Follow-UpApr 15, 2026
StatusOperational ✓
SatisfactionConfirmed ✓

Need a Custom Fume
Extraction Solution?

This was a custom-built setup designed for specific project requirements. We can support you with tailored system designs based on your facility and workflow.

Contact Us
© 2026 RemoveTheFume.com — Industrial Fume Extraction Specialists